The Government has decided to carry out Modernization and Computerization of 32 Border Check Posts in total, which includes 24 border check posts of Transport Department and 8 new border check posts of Sales Tax & State Excise Department.
List of 24 Border Check Post
S.No. |
Type of BCP |
Place |
Taluka |
District |
Road details |
Adjoining state |
Present Status |
1 |
Major |
Dapachary |
Talasari |
Thane |
NH 8 |
Gujarat |
In Operation |
2 |
Major |
Haddakhed |
Shirpur |
Dhule |
NH 3 |
M.P. |
In Operation |
3 |
Major |
Navapur |
Navapur |
Nandurbar |
NH 6 |
Gujarat |
In Operation |
4 |
Big |
Kagal |
Kagal |
Kolhapur |
NH 4 |
Karnatak |
In Progress |
5 |
Big |
Deori |
Deori |
Gondia |
NH 6 |
Chhatisgad |
In Progress |
6 |
Medium |
Omerga |
Omerga |
Osmanabad |
NH 9 |
Karnatak |
In Operation |
7 |
Medium |
Mandrup |
South Solapur |
Solapur |
NH 13 |
Karnatak |
In Operation |
8 |
Medium |
Pimpalkutti |
Pandharkawada |
Yeotmal |
NH 7 |
Andhra Pradesh |
In Operation |
9 |
Medium |
Manegaon |
Ramtek |
Nagpur |
NH 7 |
Madhya Pradesh |
In Operation |
10 |
Medium |
Banda |
Savantwadi |
Sindhudurga |
NH 17 |
Goa |
Not yet started |
11 |
Medium |
Marawade |
Mangalvedha |
Solapur |
NH 9 |
Karnatak |
Not yet started |
12 |
Medium |
Saoner |
Saoner |
Nagpur |
NH 69 |
Madhya Pradesh |
In Operation |
13 |
Small |
Purnad |
Muktainagar |
Jalgaon |
SH 8 |
Madhya Pradesh |
In Progress |
14 |
Small |
Borgaon |
Surgana |
Nasik |
SH 23 |
Gujarat |
In Progress |
15 |
Small |
Rajura |
Rajura |
Chandrapur |
SH 264 |
Andhra Pradesh |
In Progress |
16 |
Small |
Biloli |
Biloli |
Nanded |
SH 225 |
Andhra Pradesh |
In Progress |
17 |
Small |
Chorwad |
Raver |
Jalgaon |
SH 4 |
Madhya Pradesh |
Not yet started |
18 |
Small |
Deglur |
Deglur |
Nanded |
SH 6 |
Andhra Pradesh |
Not yet started |
19 |
Small |
Khapri |
Chandur bazar |
Amravati |
SH 6 |
Madhya Pradesh |
In Progress |
20 |
Small |
Akkalkua |
Akkalkua |
Nandurbar |
SH 4 |
Gujrat |
In Progress |
21 |
Small |
Shinoli |
Chandgad |
Kolhapur |
SH 121 |
Karnatak |
In Progress |
22 |
Small |
Warud |
Warud |
Amravati |
SH 244 |
Madhya Pradesh |
In Operation |
23 |
Small |
Peth |
Peth |
Nasik |
NH 848 |
Gujarat |
Not yet started |
24 |
Small |
Chindwada |
Chindwada |
Nagpur |
NH 26B |
Madhya Pradesh |
In Progress |
List of locations for 8 Eight Sales Tax Check Post
- J N P T (Sea Port) Raigad
- M B P T ( Sea Port) Mumbai
- Kalamboli (railway C.P) Mumbai
- Mulund (railway C.P) Mumbai
- Panvel (railway C.P) Raigad
- Jogeshwari (railway C.P) Mumbai
- Airport Mumbai Sahar Cargo Complex
- Nagpur Air Cargo Complex (Proposed)
Name of the project |
: Modernization and computerization of Integrated Border Check Posts at 24 (Twenty-Four) locations in the state of Maharashtra on Build Operate & Transfer (BOT) basis |
Contractor (Concessionaire) Concession Agreement |
: Maharashtra Border Check Post Network Limited.(MBCPNL)
Between Transport Department & MBCPNL |
Work Order Details |
: MSRDC letter no MSRDC/02/BCP/1939 dated 05.05.2009 |
Commencement Date |
: 05.05.2009 |
Concession Period |
: 24 years 6 months.(Including construction period of 18 months) |
Independent Consultant |
: SAI consulting Engineers, Ahmadabad |
The Modernised and Computerised Border Check-Posts will have the following features:-
- Admin Building
- Transport office
- Operator Booths
- Parking Area
- Godowns
- Auto Mechanical/Wring/Electrical Repairing Workshop
- Detention Yard
- Hostel with Mess (Dormitory , Three person sharing, single occupying )
- Residential quarters
- Toilet Blocks
- Electronic weigh bridges
- Cassettes/C.D.s shop
- Video-Surveillance
- Automatic vehicle identification
- Computers and Hardware
- High - Mast yard illumination
- Electronic and electrical equipments
- STD/PCO/Cyber Café
- Check-post software
- Dhaba/Eateries
- Puncture Repairing Shop
- General Stores
- Medical Stores
- Dormitory / Rest Room for vehicle drivers
Project Cost : 1000.00 crore
The Modernisation and Computerisation of Border Check-Posts will achieve the following objectives: -
- Clearance through 100% full-proof checking
- Solution to hassle-free and speedier clearance
- Reduction in down-time from entry to exit
- As the functions of three departments (Transport, Sales-Tax and State Excise) clubbed together under one-roof, it will be respite for the transporters from cumbersome and time-consuming clearance procedures.
Out of the total of 24 Border Check-Posts, 9 Border Check-Posts are already operational. In case of remaining Border Check-Posts, all-out efforts are being made to make them operational as fast as possible.
Among many challenges faced, the major one is the acquisition of encumbrance-fee land.